Please report any queries concerning the funding data grouped in the
sections named
"Externally Awarded"
or
"Internally Disbursed"
(shown on the profile page) to your Research Finance Administrator.
Your can find your Research Finance Administrator at http://www.ucl.ac.uk/finance/research/post_award/post_award_contacts.php
by entering your department
Please report any queries concerning the student data shown on the
profile page to:
Email: portico-services@ucl.ac.uk
Help Desk: http://www.ucl.ac.uk/ras/portico/helpdesk
Email: portico-services@ucl.ac.uk
Help Desk: http://www.ucl.ac.uk/ras/portico/helpdesk
A DATA-DRIVEN SAFETY EARLY-WARNING SYSTEM FOR UNDERGROUND CONSTRUCTION
Working with Wuhan Metro Co., Ltd in China I developed a safety early-warning system using data mining of over five million geotechnical monitoring records to achieve zero fatality in 6-year constructions of tunnels over 200 kilometres.
• Ma, L.*, Ding, L., and Luo, H. (2014). “Non-linear description of ground settlement over twin tunnels in soil.” Tunnelling and Underground Space Technology, 42, 144–151.
• Guo, J.*, Ding, L., Luo, H., Zhou, C., and Ma, L. (2014). “Wavelet prediction method for ground deformation induced by tunneling.” Tunnelling and Underground Space Technology, 41(1).
• Ma, L., Luo, HB*, et al. (2013). “Safety risk analysis based on a geotechnical instrumentation data warehouse in metro tunnel project.” Automation in Construction, 34, 75–84.
• Ding, L., Ma, L.*, Luo, H., Yu, M., and Wu, X. (2011). “Wavelet Analysis for tunneling-induced ground settlement based on a stochastic model.” Tunnelling and Underground Space Technology, 26(5), 619–628.
• Luo, H., Z. Guo and L. Ma (2013). A Safety Risk Management Database for Metro Construction Project. 30th CIB W78 International Conference.
1 Researchers
- The Bartlett Sch of Const & Proj Mgt
1 External
Collaborators
-
Professor Lieyun DingHuazhong University of Science and Technology - China
› More
search options
Status:
Complete
Themes


Topic-related Countries

